2025-01 - Town of Newbold Culvert Project
Estimated Cost: $45,000.00
Actual Cost: $35,973.42
The Town of Newbold will be replacing this culvert. The culvert is currently submerged, overgrown, and hard to see.
- before photos -
A survey was completed on October 24, 2024.
- after photos -
After photos will be uploaded soon.
2025-02 - Boom Lake Project
Estimated Cost: $22,000.00
Actual Cost: $ 16,557.25
Before photos for this project.
A survey, completed on October 24, 2024 will help determine how high vegetated rock rip rap will need to be installed along the bank to create a protection for the shoreline. It also determines what size rock should be used and if a vegetated bag wall is needed above the rock if the rock doesn't come up high enough at the shoreline.
2025-03 - Wisconsin River Project
Estimated Cost: $50,000.00
Actual Cost: $ 58,740.00
Before photos for this project.
A survey on this property was done on October 24, 2024. It will help determine the placement of a vegetated bag wall (if needed) and rock along the shoreline of a lake or river. Vegetating the rock will create a more natural, well protected shoreline.